Huntington, MA

Huntington, MA Accessory Dwelling Unit (ADU) Rules

City Acceptance Rating: Not rated yet

Last Updated: 11.22.2026

What You Need To Know

Huntington's bylaw only provided for accessory family dwelling units inside the existing home or in an addition, and did not allow detached ADUs. The state's 2024 Affordable Homes Act overrides that: one ADU up to 900 square feet, or half the main home's gross floor area if smaller, is now allowed by right on a single-family lot, attached or detached, with no owner-occupancy requirement. Where the local bylaw is stricter, state law controls.

Type of ADU Permit Required

A building permit for an ADU that meets the state rules. Confirm with the Building Department how the Town is handling its older accessory apartment section.

ADU Rules

  • Number: One ADU by right per single-family lot.

  • Types: Inside the home, attached, or detached under state law. Huntington's older bylaw did not allow detached units.

  • Size: Up to 900 square feet or half the main home's gross floor area, whichever is smaller.

  • Owner occupancy: Cannot be required for a by-right ADU.

  • Parking: No more than one space can be required for the ADU, and none within half a mile of a transit station.

  • Setbacks and height: The district's dimensional rules still apply.

  • Rentals: The Town can restrict short-term rentals.

From Our Experience

We have not completed a build in Huntington yet. These notes come from our work in nearby towns under the same state rules.

  • Outside the village, lots are on wells and septic. Board of Health review of both comes before the building permit.

  • Huntington sits in the Westfield River valley with steep hillsides. Floodplain along the river and slope everywhere else shape where a building can go.

Water and sewer. The village center has public water and sewer. Ask the Water and Sewer Department whether the ADU can tie into the existing house services.

Resources

Previous
Previous

Granby, MA

Next
Next

Hatfield, MA